-
-
Campus Operations Office
If you plan to submit a response to any solicitation listed below, after downloading, please send an email to us (see contact information at left) and have your company added to the mail list for any future amendments; include the project name and number, company name, address, phone number and email address.
Project Name: SCC- P. Dan Hull Building Roof Replacement
Project Number:H59-N227-PD
Bid Documents and Specifications: SCC - P. Dan Hull Building Roof Replacement
Drawings: SCC- P. Dan Hull Building Roof ReplacementProject Name: SCC- TRC BMW Welding Lab Renovation
Project Number:SCC BMW 082
Bid Documents and Specifications: SCC - TRC BMW Welding Lab Renovation
Drawings: SCC- TRC BMW Welding Lab RenovationProject Name: SCC- Jack A. Powers Building "B" and "D" Wing Reroofing Construction Project
Project Number:H59-6148-JM-E
Bid Documents and Specifications: SCC - Jack A. Powers Building "B" and "D" Wing Reroofing Construction Project
Drawings: SCC- Jack A. Powers Building "B" and "D" Wing Reroofing Construction ProjectProject Name: SCC- Exit Door Emergency Locking Capacity
Project Number: SCC ALL 080
Quote Package and Drawings: SCC - Exit Door Emergency Locking CapacityProject Name: SCC- Giles Sidewalk Repairs II
Project Number: SCC GCC 081
Specifications and SE-331: SCC - Giles Sidewalk Repairs II
Addendum #1: SCC- Giles Sidewalk Repairs II 5/5/2023Project Name: SCC- HVAC Projects; RE-BID Evans Cooling Tower Replacement
Project Number:H59-6206-FW-B
Bid Documents and Specifications: SCC- HVAC Projects; RE-BID Evans Cooling Tower Replacement
Drawings: SCC- HVAC Projects; RE-BID Evans Cooling Tower Replacement
Addendum #1: SCC HVAC Projects: RE-BID Evans Cooling Tower Replacement 4/4/2023
Addendum #2: SCC HVAC Projects: RE-BID Evans Cooling Tower Replacement 4/12/2023Project Name: SCC- Campus Operations and Energy Plant Roof Replacement
Project Number: SCC COB 075
Bid Documents and Specifications: SCC- Campus Operations and Energy Plant Roof Replacement
Drawings: SCC -Campus Operations and Energy Plant Roof Replacement
Addendum #1: SCC- Campus Operations and Energy Plant Roof Replacement 4/20/2023Project Name: SCC- RE-BID Hull/Powers Transformer & Switch Replacement
Project Number: H59-6197-JM-C
Bid Documents: SCC- RE-BID Hull/Powers Transformer & Switch Replacement
Drawings and Sprcifications: SCC - RE-BID Hull/Powers Transformer & Switch ReplacementProject Name: SCC- RE-BID Cherokee CAMIT HVAC Upgrade
Project Number: SCC CAM 078 A
Project Manual, Specs & Drawing: SCC- RE-BID Cherokee CAMIT HVAC UpgradeProject Name: SCC- Cherokee CAMIT HVAC Electrical Upgrade
Project Number:SCC CAM 077
Project Manual: SCC -Cherokee CAMIT HVAC Electrical Upgrade
Drawings: SCC- Cherokee CAMIT HVAC Electrical Upgrade
Addendum #1: 02/28/2023
Addendum #1 Drawings DATED: 02/27/2023Project Name: SCC- TRB Suite 300 Restroom Renovation
Project Number:H59-6205-JM-J
Specifications: SCC -TRB Suite 300 Restroom Renovation
SE - 331: SCC- TRB Suite 300 Restruoom RenovationProject Name: SCC- HVAC Projects; Tyger River Warehouse Boiler Replacement
Project Number: H59-6206-FW-C
Project Manual & Specs: SCC - HVAC Projects; Tyger River Warehouse Boiler Replacement
Drawings: SCC HVAC Projects: Tyger River Warehouse Boiler ReplacementProject Name: SCC- BMW Lockset Project
Project Number:SCC BMW 076
Specifications: SCC - BMW Lockset Project
SE - 331: SCC - BMW Lockset Project
Addendum #1 1-26-2023Project Name: SCC- Rebid Giles Campus Stream Stabilization
Project Number:SCC GCC 063 A
Bid Documents and Specifications: SCC - Rebid Giles Campus Stream Stabilization
Drawings: SCC-Rebid Giles Campus Stream Stabilization
Addendum #1 2-9-2023Project Name: SCC- Terhune Building Water Proofing
Project Number:SCC DLT 072
Bid Documents and Specifications: SCC - Terhune Building Water Proofing
Drawings: SCC-Terhune Building Water Proofing
Addendum #1 1-31-2023Project Name: SCC- TRB 87 Warehouse Floor Repair
Project Number:SCC TRB 070
Bid Documents and Specifications: SCC - TRB 87 Warehouse Floor Repair
Drawings: SCC-TRB 87 Warehouse Floor Repair
Addendum #1 - 02/01/2023
-
-